London 2012 Olympic Games Days To Go, About London Olympic Games News,Photos,Videos,Topics........
Buried under the London Olympic Stadium into the problem of radioactive waste re-use
Alleged that the seat stadium several years ago, is a landfill. The landfill violated the law , will be a large number of elements with thorium and radium waste buried in the underground , while the Olympic venues when the site and did not notice this.
Despite official claims that the United Kingdom , the Olympic tournament , the ground floor of the waste will not cause any harm to athletes and spectators , but they waste Querang use plans stalled after the match venues . That it should be razed , or continue to be used for commercial purposes , officials did not give a definitive answer.
Some experts support the stadium razed to the ground , because this waste will be re- exposed , people can move them to a safe place.
Analysts John said: "The Olympic venues are located in the re-use can not be rushed and not planned, it will hurt the interests of nearby residents . In general , no matter for what purposes , people risk analysis of radioactive waste are all heart Deposit doubt . "
ondon Olympic Torch Relay to be published in May 2012 arrived in the United Kingdom
Olympic torch 's origins date back to ancient Greece 's Olympic Games , when the messenger who came to cities from Olympia to the people that race date . They invited people from around the Olympia to participate in the competition , marking the sacred truce was provided one month before the start of the race and during the game , people would stop all wars . Modern Olympic flame is still lit in Olympia , the ancient Greek tradition with the consistency , people still use the sun to light the Olympic flame . Olympic flame has a long history of precipitation, it is not only on behalf of the London 2012 Olympic Games , but also a symbol of peace , which lasted several centuries old game history, participants and winners of the achievements and performance of the Olympia 's outstanding contribution . Olympic flame arrives in the UK, it calls the world 's athletes : the Olympic Games approaching , so we gather here, race it!
London Olympic Games, the Olympic Park project is being carried out on the greening
A giant walking bridge connects with the simultaneous construction of the Olympic Park Stratford City, the bridge 10 meters in height, will build a "floating garden."
Park Avenue is a replica of the northern part of St. James and Hyde Park Road next to the boulevard and the cage built, equipped with a unique design on both sides of the street lamps, guard rails and traffic management facilities, so visitors feel like arriving in a park them.
Olympic Delivery Authority chief executive David - Higgins said: "We cleaned up industrial land, and for the London 2012 Olympic Games has created a green background, this project will constitute the United Kingdom more than one century, the largest city in Park, as a precious legacy for the benefit the public in London. "
"With the inspiration derived from the Victoria Park, this brand new 'major parks' pastures, gardens, woods and rivers, the masses will be the transport hub in east London to provide a wonderful core area of public recreation areas, wild animals will be here live in harmony with humans. "
2012 London Olympic stadium will be recycled materials
London police said they confiscated 52 tonnes from the guns, knives, metal keyboard dismantled. Some materials will be melted, for bridges, buildings, cars, trains construction, while others will be recycled for the construction of Olympic venues.
The main purpose of doing so is to reflect the designer Populous architects advocated by environmental philosophy. It is learned that the London 2012 Olympic venues will eventually be using a series of not disrupt the ecological balance of the material, including marijuana.
We really like the Olympic Games promote the concept of such a recycling. It is reported that the 2010 Vancouver Winter Olympics and Paralympic Games were awarded gold, silver and bronze medals will be included from the waste TV sets, computers and keyboards and other electronic refuse derived metal.
2012 London Olympic venues may be used as the 2018 soccer World Cup
Is responsible for the arrangements in the Capital Gymnasium in all venues of the London bid to host the World Cup, United have confirmed that the main Olympic stadium, together with the Emir of Arsenal and Tottenham Hotspur stadium planned new stadium are in their consideration of the inside.
However, if access to London's 2018 World Cup bid, Wen Boley Stadium can be used to host the opening ceremony and the finals, it does not seem to need to enable the other three London venues.
A United spokesman told reporters in London, said: "London, United hope to the main Olympic stadium as a 2018 World Cup bid in an alternative venue."
London Olympic Committee (LOCOG) Chairman Sebastian 2018 bid team members • Division insisted that the main stadium after the Games should be mainly used for track and field events, while the capacity of 80,000 during the Olympic Games will also be reduced to 30,000.
• Olympics minister Tessa Jowell in July this year, excluding the Olympic main stadium being used as the possibility of the World Cup in 2018, but the newly established specifically responsible for planning the Olympic venues after the game use of the program of the Olympic Park, and asset management companies have been does not exclude the possibility of the capacity to keep the original audience.
A spokesman said: "The Olympic Park Asset Management company is currently considering including the main stadium after the match, including use in relation to the Olympic venues. At this stage, have not been ruled out any possibility, but also undetermined."
"Undoubtedly the main stadium will assume its in competitive sports all the functions. From now until Christmas, we will be through further research to determine the main venues to maximize the use of the program and its most appropriate scale."
"We will continue to support London's 2018 World Cup bid."
16 wish to participate in the British cities bid to host the 2018 World Cup must be the end of November to submit their own programs, in December will be decided at the 12 selected cities.